Trianel Windpark IRM campaign

The Trianel Windpark is located 45 km north of Borkum in Germany.
North Sea, 45 km north of Borkum, Germany

Scope
ICCP exchange and retrofit campaign for 32 WTG’s
- Engineering, preparation and scheduling
- As-found survey of 32 WTG’s (Wind Turbine Generators)
- Replacement of defect anodes and cables
- Installation of retrofit cable protection
- Post-processing

Execution
N-Sea’s smart solution
The DSV EDT Protea was deployed for this fast-track, technically demanding project. Multiple disciplines were required, including ROV services, diving support, topsides preparations and CTV logistics.
Thanks to the vessel’s large accommodation capacity, all skilled offshore personnel were housed on a single vessel. Through careful planning and simultaneous operations, offshore execution time was reduced and wind farm downtime minimised.